Government hospital — clinical flooring & MEP
Two phases of clinical vinyl flooring, then the multi-trade scopes that followed — thirteen separate awards from the same facility, with further works running today.
The hospital needed damaged vinyl replaced across occupied clinical areas. Working under infection-control protocols, we sequenced the works ward by ward so adjacent departments stayed open throughout. Substrates were levelled and moisture tested before laying; every seam was heat-welded and every wall junction coved and capped, producing a fully sealed floor that meets clinical hygiene requirements.
Phase 2 was awarded on the strength of Phase 1. An anti-slip package for the washrooms followed, and from there the relationship widened into mechanical, plumbing, electrical and equipment scopes. Because the facility already holds our vendor registration, insurance file and approved method statements, mobilisation on a new scope now takes days rather than weeks.
- Sector
- Government · healthcare
- Environment
- Live, occupied hospital
- Awards
- 13 separate scopes
- Trades
- Flooring · mechanical · plumbing · electrical · equipment
- Protocols
- ICRA / PCRA infection control
- Removal and certified disposal of existing floor coverings
- Substrate preparation, levelling screed and moisture testing
- Medical-grade homogeneous sheet vinyl, heat-welded throughout
- 100 mm coved skirting with capping strip
- Anti-slip treatment to washroom floors
- Back-up air-conditioning supply and installation
- Grease trap installation and associated drainage
- IT room build-out and emergency lighting installation