Interior fit-out
Turnkey office, clinic, showroom, retail and industrial fit-out, from strip-out to handover.
ExploreInterior fit-out, specialist flooring, MEP and facility care across the UAE — delivered inside hospitals, offices and showrooms that stay open while we work.
Government hospital, UAESealed sheet vinyl laid through an occupied wing
Figures cover January 2025 – July 2026
Eco Formax was established in Dubai in January 2025. Roughly half the value we have delivered was executed inside premises that stayed operational throughout — including government hospitals working under infection-control protocols.
Our own engineers and site crews carry the work, so supervision is never subcontracted, the programme is ours to hold rather than ours to chase, and the documentation pack is assembled as the job runs instead of scrambled together at handover.
About the company“We would rather be called back than called first.”
Most clients start with a single trade and consolidate. Holding the whole scope under one vendor — one contract, one insurance file, one point of contact — removes the interface risk that causes most programme slippage.
Turnkey office, clinic, showroom, retail and industrial fit-out, from strip-out to handover.
ExploreMedical-grade vinyl with heat-welded seams, and heavy-duty floors that carry vehicle traffic.
ExploreTrade-level MEP delivered in coordination with the interior programme — not after it.
ExploreSingle, double and acoustic build-ups, with bulkheads detailed to the drawing.
ExplorePlanned and reactive support once the building is back in use, with response windows in the contract.
ExploreEnabling works and industrial-scale scopes across free zones and yards.
ExploreThirteen separate scopes from one government hospital — flooring, mechanical, plumbing, electrical and equipment works — each quoted and delivered on its own merit.

Two phases of clinical vinyl flooring, then anti-slip treatment, back-up air-conditioning, grease-trap drainage, an IT room build-out and emergency lighting — all inside a fully operational hospital.

A bare industrial unit turned into a customer-facing detailing centre — civil, interior, MEP and finishes as one package.

Display floor, demonstration suite and support spaces, taken from measured layout to a 3D-approved design.
The concentration in healthcare is deliberate. It is the hardest sector to enter, the slowest to leave, and the standards it demands are the ones we then apply everywhere else.
Share of contract value executed, January 2025 – March 2026
Most disputes start at pricing, not on site. Measuring first and itemising the BOQ means variations are the exception rather than the business model.
We visit, measure and photograph before we price. No desktop guesses.
Itemised bill of quantities with unit rates against measured quantities.
Method statement, risk assessment, permits, insurance and submittals — approved in writing first.
Phased to keep you operational, with daily progress notes and a weekly report.
Joint inspection, signed snag register, as-builts, warranties and O&M as one pack.
Twelve-month workmanship cover, with an AMC available from the day of handover.
Response windows are written into the contract, not offered as a courtesy — and the crew that built the space is the one that comes back to it.
Facility care & AMCRegistered and approved vendor status with UAE government healthcare authorities and federal ministries — slow to obtain, difficult to hold, already in hand.
Hoarding, phasing, night shifts and infection control are routine here, not exceptional.
Interiors, flooring, MEP, gypsum, facility care and industrial works under a single contract and insurance file.
Four civil and MEP engineers and more than fifty technicians — supervision is never subcontracted.
Measured layouts and 3D visualisation of key spaces before any material is ordered, so what you approve is what arrives.
Method statements, ITPs, submittals, as-builts, warranties and O&M — handed over as one pack, still defensible a year later.
You will have a measured, itemised quotation back — and a named person to discuss it with. Availability for a new enquiry is normally confirmed within 48 hours.