Approved vendor — UAE government healthcareDubai · Sharjah · Ajman · UAQ · RAK
Eco FormaxTechnical Services LLC
Technical contracting · Umm Ramool, Dubai

Built for buildings that cannot close.


Interior fit-out, specialist flooring, MEP and facility care across the UAE — delivered inside hospitals, offices and showrooms that stay open while we work.

  • Availability confirmed within 48 h
  • Written quotation in 2 working days
  • 12-month workmanship warranty
Completed hospital corridor with continuous sealed sheet vinyl, coved to the wall

Government hospital, UAESealed sheet vinyl laid through an occupied wing

26Projects delivered
11Direct clients
13Scopes awarded at one government hospital
50+Technicians & helpers
4In-house civil & MEP engineers

Figures cover January 2025 – July 2026

Registered & approved vendor across
  • Federal ministriesRegistered vendor
  • Government hospitalsApproved vendor
  • Government free zoneRegistered vendor
  • Higher educationRegistered vendor
  • National insurerRegistered vendor
Who we are

We self-deliver. Nothing is handed off.

Eco Formax was established in Dubai in January 2025. Roughly half the value we have delivered was executed inside premises that stayed operational throughout — including government hospitals working under infection-control protocols.

Our own engineers and site crews carry the work, so supervision is never subcontracted, the programme is ours to hold rather than ours to chase, and the documentation pack is assembled as the job runs instead of scrambled together at handover.

About the company
“We would rather be called back than called first.”
Moinuddin AnsariFounder & Managing Director
Capabilities

Six capabilities. One contract.

Most clients start with a single trade and consolidate. Holding the whole scope under one vendor — one contract, one insurance file, one point of contact — removes the interface risk that causes most programme slippage.

Interior fit-out

Partitions · ceilings · joinery · doors · painting · signage

Turnkey office, clinic, showroom, retail and industrial fit-out, from strip-out to handover.

Explore

Specialist flooring

Sheet vinyl · LVT · tiling · epoxy & PU · polished concrete

Medical-grade vinyl with heat-welded seams, and heavy-duty floors that carry vehicle traffic.

Explore

MEP & technical

Electrical · HVAC · plumbing · data · fire interface

Trade-level MEP delivered in coordination with the interior programme — not after it.

Explore

Gypsum & ceilings

Partitions · bulkheads · mineral tile · acoustic

Single, double and acoustic build-ups, with bulkheads detailed to the drawing.

Explore

Facility care & AMC

AMC · handyman · call-outs · cleaning

Planned and reactive support once the building is back in use, with response windows in the contract.

Explore

Industrial solutions

Demolition · strip-out · site works · waste

Enabling works and industrial-scale scopes across free zones and yards.

Explore
Track record

Repeat orders, not referrals alone.

Thirteen separate scopes from one government hospital — flooring, mechanical, plumbing, electrical and equipment works — each quoted and delivered on its own merit.

Eco Formax technician dressing medical-grade sheet vinyl to the wall in a clinical room
In delivery · live hospital

A government hospital that keeps calling us back

Two phases of clinical vinyl flooring, then anti-slip treatment, back-up air-conditioning, grease-trap drainage, an IT room build-out and emergency lighting — all inside a fully operational hospital.

Sector
Government · healthcare
Awards
13 separate scopes
Trades
Flooring · mechanical · plumbing · electrical · equipment
Environment
Live, occupied hospital
Read the case study
Sectors we serve

Half our work happens in buildings that cannot close.

The concentration in healthcare is deliberate. It is the hardest sector to enter, the slowest to leave, and the standards it demands are the ones we then apply everywhere else.

  • Government & healthcareHospitals, clinics, public facilities49%
  • Commercial & corporateOffices, business centres, warehouses29%
  • Automotive, retail & hospitalityShowrooms, detailing, restaurants12%
  • Residential & privateVillas, apartments, conversions6%
  • Industrial & free zoneYards, gates, enabling works4%

Share of contract value executed, January 2025 – March 2026

How we work

Six stages, none of them optional.

Most disputes start at pricing, not on site. Measuring first and itemising the BOQ means variations are the exception rather than the business model.

  1. STAGE 01

    Enquiry & site survey

    We visit, measure and photograph before we price. No desktop guesses.

  2. STAGE 02

    Design & BOQ

    Itemised bill of quantities with unit rates against measured quantities.

  3. STAGE 03

    Approvals & mobilisation

    Method statement, risk assessment, permits, insurance and submittals — approved in writing first.

  4. STAGE 04

    Execution

    Phased to keep you operational, with daily progress notes and a weekly report.

  5. STAGE 05

    Testing & handover

    Joint inspection, signed snag register, as-builts, warranties and O&M as one pack.

  6. STAGE 06

    Warranty & maintenance

    Twelve-month workmanship cover, with an AMC available from the day of handover.

After handover

We are still on the phone.

Response windows are written into the contract, not offered as a courtesy — and the crew that built the space is the one that comes back to it.

Facility care & AMC
4hEmergency call-out
24hStandard call-out
48hWritten quotation
12 moWorkmanship warranty
Why Eco Formax

Six reasons, and none of them is price.

Accredited where it counts

Registered and approved vendor status with UAE government healthcare authorities and federal ministries — slow to obtain, difficult to hold, already in hand.

Built for live buildings

Hoarding, phasing, night shifts and infection control are routine here, not exceptional.

One vendor, six trades

Interiors, flooring, MEP, gypsum, facility care and industrial works under a single contract and insurance file.

Our own engineers and crews

Four civil and MEP engineers and more than fifty technicians — supervision is never subcontracted.

Design before you commit

Measured layouts and 3D visualisation of key spaces before any material is ordered, so what you approve is what arrives.

Documentation that survives audit

Method statements, ITPs, submittals, as-builts, warranties and O&M — handed over as one pack, still defensible a year later.

Next step

Send us the drawings and the deadline.

You will have a measured, itemised quotation back — and a named person to discuss it with. Availability for a new enquiry is normally confirmed within 48 hours.

WhatsApp